Recently Completed Projects

 

M41n - Main st & 41st ave, vancouver bc

Work performed: whole building airtightness testing

Airtightness testing setup.

The Part 3 Step Code requires a whole building airtightness result. This test provides a verified metric to show energy loss through air leakage. This value in incorporated into the project’s energy model giving owners, tenants and building officials an accurate idea of the building’s future energy use.

  • Concrete and CLT wood framed structure

  • Commercial and Residential Zones

  • Guarded and zonal testing to provide a single air-leakage result

A pleasure working with @renditionconstruction @enertech.solutions Kane Consulting

 

MPH - W31st Ave., Vancouver BC.

Work performed: passive House testing and verification

Passive House on-site final verification.

MidConstruction and (prior-to) Final verification and submittal. To meet the Passive House Institute Criteria and the City of Vancouver Passive House Guidelines.

  • Airtightness Technician (Blower Door) to the Passive House Standard.

  • Ventilation Final Testing.

  • Verified installed assemblies, components, systems and details. Envelope and mechanical.

A pleasure working with Impact Engineering and Naikoon Contracting.

@passivehousecan post

 

North vancouver retrofit

Work performed: energuide evaluation - rebate verification

Post Retrofit Visit for a home that is disconnecting from gas and saving money while doing it.

Pre and Post EnerGuide Rating System Assessment to meet Greener Homes Grant funding requirements. Client replaced a gas furnace with a heat pump and added a solar installation and now creates more energy than the home uses.

  • Airtightness Technician (Blower Door)

  • Submitted ERS files

  • Verified installed assemblies, components, systems and details. Envelope and mechanical.

 

Wilkinson Rental - 1715 Cook St, Vancouver, BC

work performed: LEED Green Rater

LEED on-site final verification.

Meeting the City of Vancouver Green Building Policy for Rezoning

  • Compartmentalization Testing (Blower Door).

  • Ventilation Verification.

  • Verified installed assemblies, components, systems and details. Architecture, Landscape, Electrical, Interior Design and Mechanical.

  • Submittals and Certification.

Working with Cressey Development Group and Kane Consulting.

awarded LEED v4 Gold