This testing represents a new and critical effort to reduce energy use and increase building performance. It is required for the BC Energy Step Code and VBBL (Vancouver Building Bylaw) for both Part 9 and Part 3 buildings.
Montroc provides the airtightness testing plan, site coordination, systems preparation through to complete testing and analysis. Infrared imaging, fog testing, envelope inspections help ensure targets are met. Using a series of calibrated fans and the latest software and technology ensures the test is performed quickly and accurately.
The airtightness of a building is a critical task to reduce energy use, increase comfort and ensure the long term operation of the building’s envelope, systems and structure.